leisure
YHA Keswick
Refurbishment Following Flood Damage
• M&E services
• Fire
alarm
• Data
• Rainwater
systems
• Staff
alert system
• Duration
16 weeks
• Value
£130,000
Nuffield
Health Manchester Locate and Repair 1st Floor Leak To Ground Floor
Retail Units
• Leak
detection
• Temporary
leak management
• Intrusive
building fabric exposure
• Temporary
people management systems
• Pipework
• Flooring
repairs
• Above ground drainage
Maintenance
and Small Works Repairs Nuffield Health Centres
• Building
fabric works
• M&E Works
• Air
conditioning
• Access
control
• CCTV
• Fire alarms
Installation Of
New Hot Water
Calorifier At West Bromich Albion
• Installation
of new large calorifier
• Removal
and disposal of redundant equipment
•
Commissioning
• Value
£20,000
•
Duration 2 weeks